Port and starboard sea chests were secured through a blanking method adapted to the actual access conditions.

14 MDraft
6 HBlackout
3Main circuit valves

01 / REQUIREMENT

Field challenge

On a vessel with 14 metres draft, the receiving circuit was farther aft and less accessible than expected.

02 / METHOD

Applied approach

  1. 01

    Actual access to both sea chests was checked.

  2. 02

    Two methods were evaluated against the grid structure.

  3. 03

    Full-grid blanking was selected because of restricted access.

  4. 04

    Three main circuit valves were replaced during a six-hour blackout.

03 / OUTCOME

Customer outcome

The access constraint did not stop the operation; the method was adapted and three valves were safely replaced within the window.

FIELD RECORD / LINKEDIN

Operation records from the post

Tap any image to view it full size. Customer and vessel identity is not published.

VIDEO FIELD RECORD

This post is a video record. Watch the complete operation directly on LinkedIn.

Watch the full video

VERIFIED DELIVERY

Delivery and evidence

FACING A SIMILAR CONDITION?

Let’s make your vessel’s condition clear.

Operations Team · +90 532 459 10 81sales@thedeepmen.com