DEEPMENDEEPMENCLASS-APPROVED UNDERWATER SERVICES
FIELD SOLUTIONS

COFFERDAM / NDT

Cofferdam-assisted permanent repair

A sounding-point issue on an IACS-classed vessel was permanently resolved using a custom cofferdam and multi-stage verification.

34×34 CMSound area
50×50 CMCofferdam
4 TESTVerification

01 / REQUIREMENT

Field challenge

A controlled dry boundary was required for internal welding without unnecessary intervention to the surrounding structure.

02 / METHOD

Applied approach

  1. 01

    A 34 × 34 cm sound area was identified.

  2. 02

    A 50 × 50 cm cofferdam was installed with minimum disruption.

  3. 03

    An internal cut was made and the water drained.

  4. 04

    Ceramic backing was positioned and welding completed.

  5. 05

    Visual inspection, NDT, UT and vacuum tests followed removal.

03 / OUTCOME

Customer outcome

The repair passed four separate verification stages and was documented as a safe, permanent solution.

FIELD RECORD / LINKEDIN

Operation records from the post

Tap any image to view it full size. Customer and vessel identity is not published.

VERIFIED DELIVERY

Delivery and evidence

FACING A SIMILAR CONDITION?

Let’s make your vessel’s condition clear.

Operations Team · +90 532 459 10 81sales@thedeepmen.com